Covering – Fuselage Left Side

by | Apr 25, 2020 | Rans S20 Build, Rans S20 Fabric

There was not a lot different in covering the left (final) side of the fuselage except for two items: 1) In gluing the fabric across the top former, I could not wrap the fabric around the tube and had to do a 2″ lap-Joint on the fabric from the right side. I was a bit nervous about whether or not it would hold, but it does. 2) Once I completed the left side, I did an initial shrink on that side and then did a final shrink at 350 degrees around the entire fuselage, bottom included. I was amazed at how well the fabric fit around the fuselage.

Time Spent- Sanding: 28 hours, 30 minutes