After almost 4 months of working on the installation of the firewall, which included designing the layout of the parts that needed to be installed on the firewall, I finally put the stainless steel rivets to permanently mount the firewire to the fuselage. This effort required a lot of planning, and I’m still not 100% certain that I have everything installed correctly. Since Rans does not make an FWF install package for the Rotax 912is, I was forced to research each of the parts and lay them out in a manner that “seems” to make the best sense.