Installing Ribs

by | Feb 10, 2019 | Rans S20 Build, Rans S20 Wings

02/23/19 –

02/23/19 – Rib #8 reinforcement – Chase drilled four #40 holes to #30 through the support tab on the bottom of the bell-crank support casing and then riveted Rib #8.  2 hours

02/23/19 – Prepared tip ribs by drilling holes for the rivets for the rear spar.  Drilled four holes on each of the bow tips for mounting of the tip ribs. 2 hours.

02/20/19 – Cleaned and prepared right wing ribs using fluting pliers to straighten – as much as possible. 2 hours

02/17/19 – Painted tip rib clips in preparation for install. 2 hours.

02/16/19 – Mounted Rib Clips onto spars and riveted most of the ribs.  Holding on Rib #1 & #2 to make sure gas tanks fit properly first. 4 hours

9 + 11 =

Content Protected Using Blog Protector By: PcDrome.
Verified by MonsterInsights